Apr 13, 2023 Leave a message

Technical requirements for drilling operation of diamond PDC composite bit

(1) Drilling should strictly abide by the operating rules, reasonable selection of weight on bit, speed and pump volume. After drilling normally, do not change the drilling parameters at will.


(2) A drilling return time should be operated by one person, the operator should concentrate on, at any time pay attention to and carefully observe the drilling rate, orifice reverse water, pump pressure and engine sound or instrument value changes, found abnormal, immediately deal with.


(3) vertical shaft drill rod down, generally to stop. During deep hole decompression drilling, the drilling tool in the hole should be tightened with the lift before the rod is inverted (shall not be lifted away from the bottom of the hole). After the rod is inverted, the oil cylinder should be decompressed and run smoothly under the condition of less than the normal weight on bit. When driving, it is necessary to close the clutch lightly and reduce the pressure of the drill, so that the drill and drill tool start slowly under light load and make its force stable.


(4) When the full hydraulic power head drill is used to add a single root, the drill shall not be lifted away from the bottom of the hole to prevent the core from being pulled out and caused by core blockage. The drilling tool in the hole is tensioned with an oil cylinder. After adding the drill pipe, the drill pipe is rotated slowly at a pressure less than the normal weight on bit until it reaches the normal weight on bit.


(5) The drilling technical parameters should be adjusted when the rock formation changes. When the rock layer changes from hard to soft, the penetration rate is too fast, so the weight on bit should be reduced. When the drilling rate slows down from soft to hard, do not arbitrarily increase the pressure to avoid damage to the drill bit or deviation of the hole. Rop should be controlled when drilling in heterogeneous formations.


(6) There should be a special person to manage the washing liquid, regularly detect the quality of the washing liquid, unqualified should be adjusted or replaced in time. When the stratum changes, the performance index of the hedge lotion should be adjusted in time. Clean the circulation system and de-sand well, keep the bottom of the hole clean, and take measures when the rock powder in the hole exceeds 0.3m.


(7) The weight on bit and rotational speed can be adjusted when the core is found to be slightly blocked during drilling. If treatment has no effect, lift the drill in time. During normal drilling, the drill tool should not be lifted at will.


(8) In coring drilling with rope, if the core plugging adjustment parameters are found to be ineffective, the internal sampling cylinder should be immediately salvaged to prevent core wear.


(9) Prevent drilling from burning. Burning drill refers to the burning of diamond PDC composite bit in the drilling process due to improper operation or complex conditions in the hole. In case of light drilling, the bit will be scrapped, while in case of heavy drilling, the head carcass will be melted and sintered together with rock powder and residual core.


Send Inquiry

Home

Phone

E-mail

Inquiry